Home

Profile

News

Contact

Career

Automation

Environmental Technology

Test & Measuring Technology

IT Services

Surface Application Systems

Plastics Systems


 
 

Final acceptance - Paper manufacturer Palm in Eltmann

In March 2007 the first project kicked off in scope power industry were SAR supplied the complete electrical, process and control systems. We obtained in partnership with KRIKO, company based in Merzhausen, the task to equip two steam and gas power stations. The client was paper manufacturer Palm who started the power plant projects in Eltmann and Wörth on the river Rhine simultaneously.

Part of the project team in front of the
gas turbine generator (59MVA)

SAR accepted full liability for the so called HKW3 project in Eltmann. The job was carried out in close cooperation with SAR Leipzig, Dingolfing and Slovenia.
 
On the perimeter large projects from Bertsch and EON could be completed. For our partner KRIKO we manufactured more than 50 power control panels for the HKW in Wörth.
 
to the picture gallery

Steam turbine with generator 10MVA

Inside the gas turbine

An extract from the scope of supply in Eltmann:

  • control system PCS
  • 20 fields medium voltage substation 20KV
  • 3500m medium voltage cable
  • 13 fields low voltage main distributor 4000A
  • 25 power, lighting, and process fields
  • 2 frequency converters 600KW
  • boiler safety controller (for Eltmann and Wörth)
  • emergency current concept with UPS and battery backup 230/400VAC, 24/110VDC
  • approx. 200 Sensors, transmitters, probes, regulating valves incl. differential pressure pipes

For more information write to info@sar.biz
 

  AUTOMATION             ENVIRONMENTAL TECHNOLOGY             TEST & MEASURING TECHNOLOGY             IT SERVICES             SURFACE APPLICATION SYSTEMS             PLASTICS SYSTEMS